







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Tremron Home Additions & ADU: The Huntington Beach Owner’s Guide
Tremron doesn’t make home additions or ADUs, so we need to be straight with you about that up front. If you’ve landed here searching for Tremron parts, you probably own Tremron pavers or hardscape around a home addition or ADU project, and it’s the structure side of the job – not a Tremron component – that’s failing or needs finishing. We build and install home additions and ADUs in Huntington Beach, and when a project involves Tremron hardscape we match the existing product or replace it cleanly. Expect $45,000 – $130,000 for an addition and $90,000 – $220,000 for a full ADU, depending on size and scope.
Most owners find their way here one of two ways: they’re planning an addition or ADU and want to know whether the Tremron pavers and borders already on the property can be reused, or a structure attached to a Tremron patio or walkway is showing signs it needs work.
Which Tremron Models This Applies To

Since Tremron manufactures hardscape and not structural components, what you’re really matching is the paver line around your project. Tremron’s Florida-based product families – including the Mega Olde Towne, Olde Towne, and Tremron Pavers series – come in specific nominal sizes, thicknesses, and color blends, and an addition or ADU that touches existing hardscape has to blend or terminate against those. The easiest way to identify what’s on your property is to pull a loose paver and measure it: most Tremron paving stones sit in the 2 3/8-inch thickness range for pedestrian use, with thicker profiles for driveways.
On the OEM question: Tremron distributors stock factory color blends, and matching a five- or ten-year-old paver against a new run won’t be perfect because UV fading and California sun take a toll. A quality equivalent from another hardscape maker can work for a hidden edge or a border, but for a visible field where your Huntington Beach neighbors will see it, staying with the original Tremron blend is worth the effort. We source the right paver, then build the addition or ADU to meet it. To be clear, Barrett & Sons Construction Huntington Beach is an independent builder, not affiliated with Tremron.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Tremron Home Additions & ADU Is Failing
- Heaving or uneven pavers where the addition meets the patio. Footing or drainage work for the new structure shifted the base under existing Tremron stone. That’s a base-prep problem, not a paver problem, and it needs to be corrected before the structure carries load.
- Ponding water against the new wall or slab. The addition changed the grade and now water sits where it used to drain. Huntington Beach’s flat coastal lots and seasonal rain make this common; it eats at footings and undermines pavers.
- Separating or cracked caulk and sealant at the structure-to-hardscape joint. Differential settling between the addition and the patio opens the joint. It lets moisture in and widens over a couple of winters.
- Loose or rocking pavers near the ADU entry. Traffic over a compromised base, or a missing edge restraint, lets the field spread. Each rocking stone grinds its neighbors until the pattern fails.
- Efflorescence or white haze on the pavers closest to the new walls. That’s salt migrating out of moisture trapped against the structure. It points to a water-management issue around the addition, not the stone itself.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

The real price question for most Huntington Beach owners is the addition or ADU itself, with hardscape repair or tie-in as a line item inside it. Our published ranges:
- Home Addition: $45,000 – $130,000
- ADU Construction: $90,000 – $220,000
- Garage Conversion (a smaller ADU path): $30,000 – $80,000
- Paver Patio Installation (tie-in or replacement): $3,500 – $11,000
- Paver Driveway Installation (if the project touches the drive): $7,000 – $18,000
What drives the range is size, foundation type, whether you’re building up or out, and how much existing hardscape has to be cut and matched. Every scope, allowance, and price change comes to you in writing before the work happens – the allowance that isn’t on paper is a surprise waiting for a date. Every eligible job gets permits pulled and inspections signed, and the finished work carries our 90-Day Done Right Promise.
DIY or Call Us?
You can safely check a few things yourself. Note which pavers rock underfoot, photograph the joint where the structure meets the patio, and watch where water pools after rain. Measure a loose paver so you know your Tremron size. Where DIY goes wrong is structural: cutting into a footing, re-grading around a foundation, or tying a new addition into an existing wall without engineering. Those move loads and pull permits, and an inspector will catch a shortcut the day the work is signed off – the permit inspector works for you, not for me. Our crew members have up to 28 years of experience with this kind of transition work. If you’re in Huntington Beach and unsure whether your existing Tremron hardscape can be saved, call (844) 320-2945 for a free estimate.
FAQs

How long do Tremron pavers around an addition or ADU last in Huntington Beach? A properly installed Tremron paver field with a solid base and edge restraint typically holds 20 to 30 years or more in Southern California, because we don’t get a hard freeze cycle. What shortens that life is bad drainage and missing edge restraints, not the stone. Call (844) 320-2945 for a free assessment.
Can the existing Tremron pavers be repaired instead of replaced? Often yes. If the base under a small area failed, we can lift, re-base, and relay the same pavers, and keep the field looking original. Full replacement only makes sense when the failure is widespread or the color can’t be matched. Estimates are free.
How long does a home addition or ADU take in Huntington Beach? A garage conversion runs roughly two to four months, a home addition four to seven months, and a ground-up ADU six to twelve months once permits clear. Permit timelines in Huntington Beach vary, and we tell you the schedule up front in writing. Call (844) 320-2945 to talk through yours.
How do you source the right Tremron paver for my project? We identify the exact line and color from a sample paver and order through a Tremron distributor, accepting that a new run may not perfectly match older, sun-faded stone. If a match isn’t possible, we tell you before ordering. Call (844) 320-2945 for a free second opinion on any written estimate you’ve received.
Written by the team at Barrett & Sons Construction Huntington Beach, serving Huntington Beach and nearby areas.












